Argo Mill PCP/CIP Expansion – Navachab Gold Mine

Site: Brownfields

Location

Unit Process

Commodity

Client

Services

The Navachab Gold Mine PCP/CIP Plant expansion included the installation of a new comminution circuit capable of treating 1.19 Mtpa of gold bearing ore sourced from the existing PCP plant and SAG pebble system.

The new plant incorporates an Argo IPS supplied HPGR and a STM supplied Tower Mill, wet and dry screening, cyclone classification and feed thickening.

The existing leach circuit was expanded through the addition of six new leach tanks and an additional horizontal belt filter was added to the tailings disposal system.

The project included tie-ins to existing facilities and electrical and instrumentation installation across the project.

Project duration November 2020 to December 2022.