XRT Pilot Plant Project – Southern Coastal
Site: Greenfields
The XRT Pilot Plant Project’s objective was to pilot the latest technology available for treatment of diamondiferous material and the possibility to replace current and future DMS sections as it is deemed to operate at high capacity and run at lower operational costs.
Most of the equipment and structures on the plant have been reclaimed from old existing plants, refurbished and assembled.
The XRT Module itself was supplied by Deb Tech.
The XRT Pilot Plant Project was successfully commissioned (dry stream) in November 2014.