The objective of the Camelback Project was to replace the existing grasshopper conveyor arrangement that was approaching the end of its life-cycle with a Camelback System of 198m long and 1050mm wide.
The 3 Plant Camelback Project was successfully commissioned in November 2014.
Area: Southern Coastal Mines