3 Plant Camelback Conveyor & Speeder

The objective of the Camelback Project was to replace the existing grasshopper conveyor arrangement that was approaching the end of its life-cycle with a Camelback System of 198m long and 1050mm wide.

The 3 Plant Camelback Project was successfully commissioned in November 2014.

Area:       Southern Coastal Mines